API RP 1FSC

Original price was: $66.00.Current price is: $40.00.

Recommended Practice for Facilities Systems Completion Planning and Execution, First Edition

Published by Publication Date Number of Pages
API 07/01/2013 11
PDF FormatPDF Format Multi-User-AccessMulti-User Access PrintablePrintable Online downloadOnline Download
Category:

API RP 1FSC – Recommended Practice for Facilities Systems Completion Planning and Execution, First Edition

This document applies to a wide variety of projects within the oil and gas industry excluding subsurface. Although intended for oil and gas industry, the process described in this document can be applied to other industries as well. It is intended that the processes and practices established herein can be adapted and applied from a single piece of tagged equipment to a complex petrochemical facility. The process described is intended to be applied at a system level.

The systems completion process is the sequential activities within a project that verify and prove the construction, installation, integration, testing, and preparation of systems have been completed as designed, and thus, the facility is ready for start-up and operations. The systems completion process is designed to help prepare and manage the transfer of care, custody, and control of facilities under construction through appropriate certification and documentation, such that the details of progress are evident.

Product Details

Edition:
1st
Published:
07/01/2013
Number of Pages:
11
File Size:
1 file , 300 KB
Product Code(s):
G1FSC01, G1FSC01, G1FSC01
Note:
This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran