SALE
ASAE/ASABE EP492.1
Original price was: $75.00.$45.00Current price is: $45.00.
Planning, Design and Construction of Diversions
Published by | Publication Date | Number of Pages |
ASAE/ASABE | 04/01/2014 | 7 |
ASAE/ASABE EP492.1 – Planning, Design and Construction of Diversions
This standard applies where concentrated surface flow, non-concentrated surface flow, or shallowsubsurface flow is a problem, can be intercepted by a shallow channel and a suitable outlet exists. Soil and siteconditions must be suitable to build earth channels and earth ridges and sediment accumulations must bemanageable.
Product Details
- Published:
- 04/01/2014
- Number of Pages:
- 7
- File Size:
- 1 file , 270 KB
- Redline File Size:
- 2 files , 2.6 MB